Thursday, November 20, 2025
LIRR finishes St.Albans accessibility upgrades
Friday, May 02, 2025
Late Friday Links 5/2
Saturday, April 26, 2025
Interlocking Walkthrough: WEST HEMPSTEAD
We will now take a look at the interlocking known as WEST HEMPSTEAD, also known as WM. For the purposes of this post and for the purposes of simplicity, I'll refer to it as WM in this post. WM interlocking, is a rather new interlocking, being put into service on a weekend in October of 2009.
As The LIRR Today states it, "while the naming behind WM is complicated, the interlocking itself isn't". As you may know, the West Hempstead Branch is only single-tracked for it's entire length, therefore, going east, the branch is single-tracked right up to where the pocket track splits off from the Main Track to go around to the station’s island platform.
| Photo: Wikimedia Commons |
WM Interlocking consists of one big position-light signal smack down inside the middle of the action.
Anyway, thanks for checking out this short interlocking walkthrough. Sorry it was so short and poorly put together, I had to try to make it in a short amount of time to get it out for tomorrow.
Friday, April 11, 2025
The LIRR’s Spring Trackwork Program
It’s a Friday afternoon, your waiting on the platform at Hunterspoint Avenue for an eastbound train towards the Hamptons (cuz, let’s face it who doesn’t take a train to the Hamptons in April) and you hear on the PA an announcement stating that tie replacement on [affected branch] will [cause this to happen].
Yep, that’s right we’re now approaching the busiest portion of the LIRR’s Spring Trackwork program, massive program
Here’s a general overview of what will be going on on the railroad this spring, please note that some of these have already finished, I decided to include everything that’s going on:
- Valley Stream - Switch Rehabilitation & West Hempstead Crossing Rehabilitation
- Montauk Branch - Crossing Replacement and Maintenance Activities
- ADA Station Rehabilitation - Hollis
- ADA Station Rehabilitation Project - Forest Hills
Wednesday, March 12, 2025
What The West Hempstead Branch Timetable Could Look Like
Let’s now turn our attention to the West Hempstead Branch. The West Hempstead Branch is a sad little branch, as since LIRR service expanded, its service has been slowly chipped away over the past few decades. During the peak, it feels like a rob Peter to pay Paul situation, as by giving a little West Hempstead train a rush-hour slot into Penn Station, you’d be taking away a much needed seat for Babylon, Huntington, and Ronkonkoma riders. The mentality is that poor ridership along this branch cannot justify the wasting of a rush-hour slot for a train in the cramped Penn Station.
Well, since conditions in Penn Station have greatly improved since East Side Access was unveiled, smaller branches such as the Long Beach, Far Rockaway, and West Hempstead Branches stand out the most to gain because they are no longer be “shut out” of Penn Station. My hope is that if we can increase service to stations along these branches, people will begin to gravitate back to them and things will even a tad bit out.
Included in the linked PDF file below is the full sample weekday & weekend West Hempstead Branch timetables. Peak, off-peak, reverse-peak, and special-event trains are all included. Note that this is a new and improved timetable design.
The timetables have yet to include the deadhead/non-revenue moves which will be planned out along with the crew and equipment rotations using AI and will be written down on paper. They’ll be included in a separate page in the attached pdf. Nonetheless, I have tried whenever possible to minimize the amount of deadheading as it’s essentially wasted crew and equipment hours. However, in some cases, it’s unavoidable in order to make the best use out of the resources available.
Like was said on the Introduction Page, before we can begin talking about the actual schedule “Key Assumptions” needs to be taken care of and mentioned before this project can become totally feasible. I’ve tried my best to make these schedules able to be done with these projects completed or not, but in some cases that isn’t possible.
Key Assumptions:
- The infrastructure on the branch will remain the same or similar to what it is now.
Service Guidelines:
- During peak hours, train service is sustained at 30-minute headways in the peak direction.
- Passengers will no longer be required to transfer trains at Valley Stream! Service will be provided to a western terminal during all daylight hours.
- With a couple of exceptions, Babylon Branch trains will no longer stop at St. Albans as it will be served exclusively by West Hempstead trains.
- During the off-peak hours, service will be provided hourly to Hunterspoint Avenue (Grand Central on weekends).
- On weekends, I was able to squeeze one additional round-trip to Penn Station during the busiest travel period.
Link to West Hempstead Branch Timetable
Tuesday, March 04, 2025
Interlocking Walkthrough: VALLEY
In today's interlocking walkthrough, we're gonna take a look at the complex and known VALLEY interlocking on the bustling South Shore. To start, a special trait about VALLEY is that of all the railroad's interlockings, at least those that lie on Long Island. It's not supsrising, as VALLEY hosts 5 of the railroads eleven branches, including the Long Beach and Far Rockaway Branches as stopping services, and the West Hempstead, Babylon, and in some cases, Montauk Branch trains pass through (one very early reverse-peak Babylon train stops there). Valley Stream marks the end of the Atlantic Branch, and the start of the aforementioned 3 branches.
Here's an arial view of the entire VALLEY interlocking (don't worry I'll explain it well):
Sorry it's so small. Anyway, starting at the westbound end of the platform, there are four tracks. The two northernmost tracks are part of the Montauk Branch (Babylon, West Hempstead, and Montauk trains usually use these tracks). Therefore, the two southern tracks make up the Atlantic Branch which is used by Long Beach and Far Rockaway trains.
![]() |
| Here's a nice look at the massive position light signals (Photo: The Position Light) |