Wednesday, April 02, 2025

Interlocking Walkthrough: CI

Our next up in our Interlocking Walkthrough series is CI interlocking in Central Islip (everyone calls Central Islip “CI”.) This interlocking sits in the Main Line (aka Ronkonkoma Branch) and is rarely used besides during track-work. This interlocking is a very simple and consistent of two switch. 


Switches

CI is a rather typical interlocking, that only consists of (going from east to west) a switch going from track 1 to track 2, then soon afterward, a switch going back to track 2. This is your typical mid-line LIRR interlocking, that’s used rarely.

Neighbors 

CI Interlocking is bordered by BRENT interlocking to the west in Brentwood, and by KO interlocking to the east in Ronkonkoma.  

The speed limit thru the area is 80 mph, which is fitting considering the long, straight stretch of track.

Tuesday, April 01, 2025

All MTA Agencies To Have A “Fare-Free Day”

After a rough winter for the MTA after Congestion Pricing failed, the MTA just announced at a press conference yesterday evening that all MTA agencies will have a "fare-free day". The news released occurred late, late last night at 11:59pm, in a small corner of the MTA's website. 

On this day, similar to what NJT did last summer, you'll be able to ride any MTA service and use the bridges and tunnels free of charge. 

The MTA hasn't announced exactly what day it'll occur, but the date is scheduled to occur on a Friday before April 30th, "a nice start to the weekend" as the MTA described it.

This morning, Governor Kathy Hochul voiced her happiness for the initiative "A fare-free day is great opportunity to make our public transit system more accessible to all", "I urge all New Yorkers to take advantage of this opportunity to explore the city".

MTA Chair Janno Lieber claimed in the press conference last night that they were also doing this as a thank you to passengers, employees, and riders alike. 

The MTA did this after months of complaints from commuters about congestion pricing, with even President Donald Trump trying to get rid of it, and the MTA has finally decided to something about it.















(April fools!)  

Monday, March 31, 2025

What The Far Rockaway Branch Timetable Could Look Like

Our fourth post will take a look at The Far Rockaway Branch. The Far Rockaway Branch is a rather short branch, and is also of relatively low-speed. However, that doesn’t mean that ridership isn’t solid, though, as it sees decent ridership just short of the Long Beach Branch.  

Included in the linked PDF file below is the full sample weekday and weekend Far Rockaway Branch timetables. Peak, off-peak, and reverse-peak trains have all been included. Note that this is a new and improved timetable design.

The timetables have yet to include the deadhead/non-revenue moves which will be planned out along with the crew and equipment rotations using AI and will be written down on paper. They’ll be included in a separate page in the attached pdf. Nonetheless, I have tried whenever possible to minimize the amount of deadheading as it’s essentially wasted crew and equipment hours. However, in some cases, it’s unavoidable in order to make the best use out of the resources available.

Like was said on the introduction page, before we can begin talking about the actual timetables, “Key Assumptions” and “Service Guidelines” needs to be taken care of and mentioned before this project can become fully feasible since I’ve built the timetables off of it. I’ve tried my best to make these schedules able to be done with these projects completed or not, but in some cases that isn’t possible.

Key Assumptions:

  • The current infrastructure on the branch will remain the same or similar to what it is now.
Service Guidelines:
  • During peak hours, I will try my best to make it as “clockface” as possible, and I will also try to meet the 20-minute headways I’ve set up. I will try to provide one flyer per rush hour, however, that’s unlikely considering the branch’s size. I will try to provide one train to/from Penn Station per hour, along with a Grand Central or Atlantic Terminal at a minimum. During most hours, one additional train will originate in Valley Stream, and make all stops west of Valley Stream to provide additional service west of there. 
  • During off-peak hours, service is provided approximately every hour to and from Grand Central.
  • During the morning reverse-peak period, apart from hourly service from Grand Central, there are also a hodgepodge of trains from Atlantic Terminal to provide additional reverse-peak service. I've also implemented hourly service from Penn Station to Valley Stream during morning reverse-peak hours to provide additional service to these Queens stations.
  • During the afternoon reverse-peak period, service consists of a mixture of trains going to all 3 city terminals. 
  • On weekends, train service is increased during the busiest times; (specifically 8:30am to 11:30am WB and 4:00pm to 7:30pm EB).


Similarly to the Long Beach Branch, peak hour service on the Far Rockaway Branch has been designed to make it easy to get to and from any one of the 3 city terminals during rush hours. I specifically designed this timetable to run on a clockface-like schedule, except unlike the Long Beach Branch, it isn't perfectly clockface. Reverse-peak service on the branch, essepcially during the earlier hours of the morning, is phenomenal, thanks to Far Rockaway having two tracks all the way to the final stop and due to it not really having a yard, meaning many of these trains are "revenue deadheads".

I believe that the 20-minute headways that were established during most of the peak should meet the ridership demands of the branch. I also believe that this branch's setup that allows you to get to pretty much any one of the three terminals during almost all the peak hours is a good system allowing for fast and frequent service. I have also added hourly trains from Valley Stream during the morning rush allowing for additional trains so provide more express runs.

During the busier periods on weekends, I was able to provide additional service to/from Penn Station (in the mornings), and Atlantic Terminal (in the evenings). I may change which terminals those extra trains go to upon further input. That is in addition to hourly trains from Valley Stream during those that will allow those extra trains to Penn Station to skip Rosedale, Laurelton, and Locust Manor. 

Especially during the morning rush, I tried to add Kew Gardens, Forest Hills, Woodside, and Sunnyside stops during convenient times to allow for intra-city travel along the branch. You will notice that additional trains have also been started.

I firmly believe my current setup for the Far Rockaway Branch will provide customers with a fast, frequent service, and if you have any questions about how this service is ran, please feel free to ask me.

As always, if you have any questions/comments/suggestions/corrections/thoughts, etc, you can leave a comment below or you can e-mail me at gavin.s.wilcox@gmail.com.

View an index of all the other sample timetables, the post about those timetables, and revision history, right here.

Tuesday, March 25, 2025

Fixing The LIRR’s Intra-City Problem

A question I always asked myself back years ago was why are there so many LIRR stations in Queens? Why just why are there so many when few get close to enough ridership to warrant their existence? Well, at that point I was on the mindset that the sole and only purpose of the LIRR is to bring LIRR commuters to and from Manhattan and Brooklyn, and that intra-island and reverse-peak customers didn’t matter. I didn’t understand enough about how the LIRR works to really understand, but it’s a good question. Anyways, obviously the LIRR prioritizes getting people between their home on Long Island and Manhattan, and Intra-island, intra-city, reverse-peak, off-peak riders, you get the idea, get the backseat over the Manhattan commuters. 

And while that makes sense to a decent extent, since this isn’t the New York City Subway system, this means that intra-island, intra-city, reverse-peak, off-peak riders, whatever, all take a back seat to the Manhattan commuters. And, that isn’t fair to them.

Many countries in other parts of the world (specifically Europe) have successfully managed to integrate their suburban commuter systems into their urban transit systems. While I don’t expect the LIRR to run trains via the subway tracks as hilarious as that is, it would be nice to see them do something to treat the inter-city riders, possibly even introducing a new fare system. There are many people in the city who would love to have to have a direct rail link locally, specifically something the subway couldn’t do. 

A good example of this is the many Queens communities that live past the final terminal of the Subways and many of them would love to have “some sort of connection” to the Subway that didn’t involve a long subway ride or a even more grueling bus ride. Many of them could take the LIRR from places such as Bayside, Douglaston, Queens Village, Hollis, or Locust Manor, but they chose not to because the price versus service provided isn’t worth it. Currently, if you live in Queens Village, for example, to get to Midtown you can hop on the LIRR, 

The common response to discussion about possible intra-city travel in the LIRR is that passengers coming in from Nassau and Suffolk Counties, and I quote from The LIRR Today, who mentioned a very valid point, don’t want to be overrun by the cities “riff-raff” who would like on and take up all their seats once they cross the city line. And while this is a valid point to some degree, I mean imagine an entire (F) trains load worth of people trying to cram onto the already standee-filled #1056 to Ronkonkoma at Jamaica. It would be complete chaos. You can’t exactly charge $2.59 for travel on the LIRR since if you did, all hell would brake loose, and really since the LIRR is a capacity-restricted system with limits. I personally don’t have to worry about this nonsense as I take the Montauk Branch, a branch that rarely makes city stops, however, if I took the Ronkonkoma Branch for example more often, I’m sure I’d notice quite a crowd piling on At Queens Village, especially during the reverse-peak.

I think the LIRR should come up with a way to encourage and incentivize intra-city travel, without going to the expense of longer-distance travelers.

In an attempt to find that workable solution, I have worked on looking after intra-city riders in my sample reworked timetables project I’ve been working on. 

First, to address the issue of service levels not meeting ideal conditions, I have worked to provide more service to stations within the city limits by having more trains terminate/originate at Great Neck and Valley Stream for example. While not directly in city limits themselves, both of them are close to the border and are convenient places to turn trains. I’ve been able to establish manageable headways by providing additional trains from these locations during both the peak and reverse-peak periods, along with expanded service during busier travel times on weekends. Additional service will also be provided to Queens Village and Hollis, which will be handed over to the brand new Belmont Park Branch which will specifically target these riders, and I’ll talk more about this in future posts! 

These trains, while not running with 12-car consists, will run as a manageable alternative to the subway, providing decent headways all day long.

On the topic of fares, while I’m not an expert on railroad fares, and don’t think I have a workable solution worth talking too much about, I’d propose an advanced version of the City Ticket, except it would be valid during all off-peak times. When I end up throwing together the final book and finalize things in this project, I may talk more about a proposed City Fare, however, for now, know that intra-city riders are well taken care of!

Monday, March 24, 2025

Interlocking Walkthrough: GARDEN

This week’s interlocking walkthrough takes us through Garden City- located deep into the heart of Nassau County. GARDEN interlocking, which is located 18.7 miles away from Long Island City, hosts both the Hempstead Branch and the Garden City- Mitchell Field Secondary, which the ladder merges off of. Here’s a bird eye view of the location:


GARDEN interlocking is just east of Garden City station, so basically, once the train leaves the station, it soon after encounters GARDEN interlocking, before entering single-track territory the rest of the way east to Hempstead.

Switches

After leaving the station on its way east, track 2 of the Hempstead Branch merges into Hempstead branch track 1.

A couple hundred feet later, there is another switch that splits the Hempstead Branch from the Central Branch, allowing it to head east towards Country Life Press and Hempstead. 

Going off to the right, the interlocking ends right before entering Country Life Press. Note that there’s a grade crossing just east of the switch, while going onto the secondary, the interlocking ends just before the third rail does. I plan to make a post on the Garden City-Mitchell Field secondary in the future, outlining its current role in the thick of LIRR operations along with my proposed role for it, so stay tuned for that but for today, I’ll tell you that the secondary goes back to two tracks shortly after Washington Avenue.

Also located in the general area is no other than the former Hempstead crossing, the former Hempstead branch crossing. While there’s no tracks anymore, many years back, the West Hempstead Branch used to continue north from its current terminal in West Hempstead, up the relatively short distance through Garden City into Mineola, where it would rejoin the mainline basically forming a loop. If you take a look on Google Earth, you can see where the tracks used to be.

Signals

GARDEN Interlocking has the standard old Pensy style position-light signals.

Neighbors

GARDEN is neighbored by QUEENS interlocking to the west, and is the easternmost interlocking on the Hempstead Branch.

As for the speed limit, it’s 70 mph west of here, however it’s restricted to 30 mph east of here before the 15 mph restriction on the curve at Country Life Press and the even lower 10 mph restriction coming into Hempstead.

Sunday, March 23, 2025

What The Hempstead Branch Timetable Could Look Like

From the West Hempstead Branch's eastern terminal of West Hempstead, we must hop a couple of blocks down Fulton Street to the east and north a little bit to get to the eastern terminal of another (much more favored) branch, the Hempstead Branch. The branch's eastern terminal of Hempstead is right across the street from Hempstead Transit Center, which is one of NICE's main bus terminals. Quite a few people, upon arrival into Hempstead Transit Center will not cross the street and hop on the LIRR but instead will change to another bus to Jamaica and hop on the subway!

Those lucky enough to make the choice to hop on the train, will take a trip up through Garden City, and stop at no less than 3 stations in Garden City, before pulling through Stewart Manor before meeting the LIRR's Mainline at Floral Park.

From Garden City through Floral Park, the Hempstead Branch runs pretty darn closer to the Mainline. Crazy enough, Nassau Blvd is only a mile south of Merllion Avenue and New Hyde Park is even closer only being a half a mile south of Stewart Manor. In both cases, the Hempstead Branch stations are not even 2 minutes apart on New Hyde Park Road. The tracks that branch off going perfectly eastbound at Garden City are actually the remnants of the old Central Railroad of Long Island and this could become the route many Ronkonkoma Branch trains could take if the LIRR were to reactivate this portion. 

The LIRR could work to use the relatively close spacing of stations to their advantage. Both New Hyde Park and Merllion Avenue lie on the busy Mainline, and due to this, they both have capacity constraints. A lot of people who would use the Hempstead Branch stations actually just end p driving to stations along the Mainline due to crowding or because service can get very lazy on this branch at times. A family friend of mine who use to commute into New York who lives very close to both Nassau Blvd and Merllion Avenue stations (slightly closer to the latter) would just go to Merllion Avenue since he said the station was quieter.  

My hope is by increasing service on the Hempstead Branch, along with the Far Rockaway and Long Beach branches, service will begin to even a tad bit out more. I personally think the Hempstead Branch definitely has some growing to do, and the LIRR just needs to help it grow.

To get onto the actual timetable, the linked .pdf file includes the full set of weekday and weekend Hempstead Branch timetables. Peak, off-peak, reverse-peak, and special-event trains trains have all been included within the timetables.

The timetables only show revenue trains, not deadhead or equipment moves, which will be planned out using AI to align with crew and equipment moves and will be written down on paper. They’ll be included on a separate page in the attached PDF. I tried to mostly minimize deadheading as it’s essentially wasted time, crew, and equipment hours but in some cases it’s unavoidable to make the most out of the resources available.

Like was said on the Introduction Page, before we can begin talking about the actual schedule “Key Assumptions” and “Service Guidelines” needs to be taken care of and mentioned before this project can become totally feasible since I’ve built the timetables off of it. I’ve tried my best to make these schedules able to be done with these projects completed or not, but in some cases that isn’t possible.

Just like the other timetable posts, here are some "Key Assumptions" and "Service Guidelines" which I built the timetables on: 

Key Assumptions

  • The current infrastructure on the branch will remain the same or similar to what it is now. 

Service Guidelines

  • During peak hours, service is provided on 20 minutes headways as a minimum throughout the course of the rush hour. Train service is provided to Penn Station, Grand Central, and Atlantic Terminal hourly. 
  • I’ve decided to cut-back a bit on service to Queens Village and Hollis stations during rush and reverse-peak hours however they will continue to get off-peak service. The Belmont Park trains will now be the main flag carriers for the branch, and they will now get 30-minute headways during off-peak hours. 
  • During off-peak hours, service is provided hourly on the branch and these trains continue to operate to/from Grand Central w/ a couple of exceptions during late-nights. 
  • During the weekday reverse-peak period, additional trains are run in the reverse-peak direction from Penn Station to help provide 30-minute headways. My hope is that by providing additional reverse-peak service, especially earlier in the rush hour, this will continue my effort of minimizing deadheading/empty equipment moves.  These trains are targeted at people holding jobs in western Nassau County, and others may take the train to Hempstead to connect with NICE bus. 

Knowing that service at Main Line stations such as Merllion Avenue and New Hyde Park would be unfortunately sporadic, I wanted the Hempstead Branch to be a fast, frequent, and viable alternative. I tried to space service on this branch evenly, so it's a good alternative to catching the train at Merllion Avenue and New Hyde Park. 

During the morning peak period, service is set up to run from Hempstead roughly every 20 minutes, and there's a direct train to/from every terminal pretty much every hour. There are multiple flyers that run over the course of the rush hour. 

During the evening peak period, service is set up a bit more sporadic, however, generally you can get a direct train from any one of the 3 main city terminals out to Hempstead every hour. 

During off-peak periods, trains continue to run from Grand Central, which I believe is fitting for the branch. 

I am personally a big advocate for improved transit in eastern Queens, therefore, I've reinstated the Belmont Park Branch to run as a full-time branch for the first time. As a result, some peak Hempstead trains that used to stop at Queens Village and Hollis will now skip the station along with Elmont-UBS Arena, which is overserved. However, most off-peak trains will continue to stop at these stations, providing bi-hourly service to Queens Village and Hollis. While it may seam a bit over, I strongly believe this branch, while very small, could succeed if done properly.

During weekend "peak" periods, I was able to provide three additional westbound trains from Hempstead towards Atlantic Terminal during the busiest times of the morning, along with four additional eastbound trains towards Hempstead. 

I thank everyone who has taken the time to read my timetables project so far, it's been a very fun project and I've learned a lot about the railroad through it. I look forward to continuing to work on it. Today's my birthday and I realized that I haven't gotten a single comment yet, it would be a nice surprise to see someone comment giving any thoughts, suggestions, corrections, etc. You can leave suggestions, thoughts, comments, etc by leaving a comment on the comment form below, or you could e-mail me at gavin.s.wilcox@gmail.com.

View an index of all the other sample timetables, the post about those timetables, and revision history, right here.

Saturday, March 22, 2025

The LIRR’s Big Bet on Midtown

The LIRR’s service plan that was put into place on February 27, 2023 obviously placed much of its emphasis on Midtown Manhattan. The service plan essentially had all trains that had ran to either Atlantic Terminal or Hunterspoint Av to be reverted to Grand Central, and while the new terminal in the Lower East Side is huge for many, it was detrimental to those that relied on those alternate terminals- those which were growing rapidly. 

Under the new service plan, the railroad has essentially sent 90% of its capacity to either Penn Station or Grand Central, with only the small 10 percent of trains for riders looking for a one-seat ride to somewhere else. The worse part is, of those trains, most of them run during very inconvenient times- the only one seat rides on the Port Jefferson and Ronkonkoma Branches leave at 4:54am and 5:30am respectively. Trains on some of the smaller branches run during better times, and, it’s great to see one-seat rides to Brooklyn during the earlier part of the rush hour, however, the most room for growth is during the center of the rush hour, and I don’t think it could hurt if the LIRR added a train or two to Atlantic Terminal or Hunterspoint Avenue on the larger branches during the center of the rush hour. It would also be great to see the LIRR extend some of the shuttle sets during the reverse-peak periods further out to Long Island. I’m not fully aware, but I’m sure many people would you use a reverse-peak from Atlantic Terminal to/from let’s say Long Beach.  

By putting all the emphasis on the two Manhattan terminals, your actually limiting growth to the entire city, since, the most growth right now is to trips other then from Manhattan to Long Island. Hunterspoint Avenue continues to be treated as pretty much a complete afterthought, as it’s used only when the LIRR has absolutely no other choice in order to not clog up Jamaica. While some people actually didn’t expect Hunterspoint Avenue to survive into the new service plan, it did and the LIRR still hasn’t done anything to improve it. Service to Hunterspoint Avenue had been cut by 9%, and they didn’t even go as far as converting the empty equipment runs over to revenue trains, something that could be easily done for zero cost, and would be a huge step in improving service out there. 

Then, there’s of course, Brooklyn. Brooklyn is personal to me, as many of my first train trips had me taking the train there opposed to Penn Station to see family there. When East Side Access opened, virtually all thru-service to Brooklyn was cut and riders ended up with a clumsy, very sloppily scheduled, and aggravating shuttle service which required customers to go up and over to a completely separate shuttle platform. Initially, as crazy as this is, the railroad actually slashed peak service between Jamaica and Atlantic Terminal by 20% over pre-pandemic service levels, but soon completely reversed that decision soon afterwards after they were proven wrong. 

The origins of East Side Access

The Long Island Rail Road first began its journey down the East Side Access route in the mid to late 1990s when both the MTA and New York State set their sights on reviving proposals to build a brand new LIRR terminal in Manhattan’s East Side. Proposals to build a new rail link had been proposed since decades before, however, those efforts had been abandoned due to the city’s financial problems. In 1995, when it was originally proposed, the city was a completely different place. New York had still been recovering from people moving out to the suburbs, and crime was still a huge problem, and it was still coming off of the worst decade in New York history

By this time, the city finally began turning around and employment was growing substantially. Attention to housing, urban decay, and crime (something Detroit really needs!) really helped the city improve and expand. Business began to return to the city, and this brought in new commuters and fueled population growth. At that time, much of New York’s major commercial office activity was centered in Lower Manhattan, which was in tough shape after decades of decline and the stock market crash. While proposals were being floated for a huge megaproject, other projects were also being worked on (such as the Second Avenue Subway). Commercial activity in other parts of Manhattan (along with the outer boroughs) was limited, and while, Midtown (the area between 42nd and 59th Streets offered the most growth, little was done about it. When the MTA decided it wanted to spend billions of dollars on the Second Avenue Subway, obviously they had to give the Suburbs something in return, and the idea of building a rail link to one of the fastest growing commercial neighborhoods in the city seamed like a good idea.

Both the MTA and the LIRR doubled down on their efforts for Midtown Direct in the months following the 9/11 World Trade Center attacks. In the wake of all the catastrophic and tremendous damage done to the World Trade Center site, which was the largest concentration of jobs in the entire Financial District), many people thought that Lower Manhattan was done for good. When the MTA reconcentrated its efforts for East Side Access, everyone thought that the Lower East Side was the next big thing, and as we know that ended up being the case. Grand Central Madison was specifically designed to make it easy to get from the platforms to all the office buildings along Madison and Park Avenues.  

Hunterspoint Avenue and LIC

Since the completion of East Side Access, Hunterspoint Avenue and Long Island City have continued the infamous tradition of being a complete afterthought. Service to both of those stations continues to be atrocious, with large gaps even during peak hours. With the introduction of direct service to the East Side, many people who used to take the train there and catch a 7 train to Midtown now just go via Grand Central Madison, therefore, ridership decreased. However, there’s still a significant amount of potential ridership growth for people with origins and destinations in Queens itself, and I believe many more people would it use it if they gave it improved service.

And, the truth is as a Long Islander, I was just driving through the area right at the yards and the development in the area is very good, it’s definitely changed since before. Development in both Hunterspoint Avenue and Long Island City have both improved, and the skyline has actually changed considerably. 

Photo: Tri-State Rail NOW

According to the United States Census Bureau’s data, the total number of jobs in the Long Island City-Hunters Pt Neighborhood has increased by nearly 68% since 2010, and this area added over 15,000 new jobs over the last decade- while the LIRR still acts like nobody uses the station or could.

Approximately 40% of those who work in this area commute from the city itself, suggesting there’s significant potential for ridership to/from the greater LIC area. For years, the LIRR has ignored requests and proposals to improve service from these stations, especially from branches in electric territory. HPA and LIC have now become diesel-only stations, served by only the diesel branches which bring the most riders from Suffolk County (who account for less then 5% of commuter demand to this area!), and do not adequately serve people coming from places further into Queens and Nassau, which account for 35% of ridership demand to/from Hunterspoint Avenue and LIC. 

Additionally,  the population of the Long Island City - Hunters Pt area has actually tripled over the last 10 years, adding 20,000 more residents who could probably take a job on Long Island if they had reasonable reverse-peak service there.

Requiring riders to either one take the subway to either Grand Central (requiring you to double back) or Woodside is definitely not an acceptable alternative. Not only are you charged for the railroad, but you also must pay a subway fare in addition to having to spend 12 additional minutes on your trip. 

I strongly suggest the LIRR should considering service to both Hunterspoint Avenue and Ling Island City, by at the minimum providing faster, and more frequent service then what is currently provided. The good thing is, the LIRR can actually do this pretty easily, and there are several ways to accomplish this, in which many of these can largely be accomplished without utilizing existing train and crew downtime outside of rush hours:

  • Converting all equipment trains and hard trains that currently run empty between LIC and Jamaica during reverse-peak and midday periods, including several revenue trains that run empty to Jamaica before starting revenue service there. 
  • Extending all diesel trains (at least on the Oyster Bay Branch) to operate to/from Hunterspoint Av and LIC. In addition to providing service to HPA/LIC while not sacrificing Manhattan service, this would also benefit diesel branch riders as they wouldn’t have to deal with annoying transfers at Huntington and double-transfers at Babylon (while I’d say the Huntington up-and-over is much worse then Babylon). 
  • Adding additional trains from the smaller electric branches to and from HPA and LIC. The LIRR’s current service plan currently has the small electric branches (West Hempstead, Hempstead, Long Beach, and Far Rockaway) continuing to see frequencies way below their capacity. The LIRR’s could easily add trains from those branches there to accomplish several things: better serve the Nassau-Queens commuter market, provide additional service opportunities to everyone on the smaller branches (no matter their destination)c, and allowing the LIRR to load these grains with the more local stops in lieu of adding stops on busier Manhattan-bound trains from busier branches, reducing travel-time for those riders all the while providing more service to HPA/LIC.
  • Reducing travel-time between Hunterspoint Avenue and Long Island City. It’s rare that you can “reduce travel time” on the LIRR, however, currently, all trains from LIC must park at Hunterspoint Avenue for several minutes, while they “load up” passengers. There’s absolutely no need for that, and given the very small distance between the stations, many trains can make the distance in only 5-7 minutes. 
  • Adding additional shuttles between Jamaica and HPA/LIC. While I can understand why the LIRR is hesitant about sending electric trains there, especially considering not all the tracks at LIC are electrified, these could help address the most acute gaps in service and can work very similar to the Brooklyn shuttles. These sets can be fed from Hillside or Jamaica-Johnson Avenue during rush hours, and can run back and forth before heading back to the yard following rush hours. 

Overall, the LIRR still serves Long Island City as if it’s only home to half-abandoned warehouses and is all industrial, yet it’s instead a thriving and rapidly growing neighborhood. There are many opportunities for the LIRR to grow service at both HPA and LIC in a way that can’t be done via a subway transfer. Even if they only convert a couple of equipment trains, it’s still something. 

Brooklyn 

Brooklyn is perhaps the worst of the problems of the new service plan. The LIRR's elimination of through-service from Brooklyn to eastern points on Long Island meant a big blow to these commuters, especially considering 85% to 90% of those riders needed to get somewhere further east then Jamaica, where the shuttles end.

The thing is ridership is growing to Brooklyn at a much faster rate then what is seen to Manhattan, and according to ticket sales data, ridership grew a whopping 23% to Brooklyn between 2016 and 2019, thats nearly half of all the new riders wanting to go to Brooklyn.

In my opinion, if anything, the LIRR should be looking to increase service to Brooklyn, not reduce it! It's even worth nothing that the considerable growth Brooklyn has gotten has taken place even after the LIRR has pretty much ignored it over the last 40 years. You can only imagine the growth that would occur if the LIRR actually improved service substantially there.

Brooklyn is more personal to me because I used to take it before the service changes much more to go see family, but as time has gone on, I've unfortunately gone there less, however, when I do take the train there, the up-and-over normally doesn't bother me to much, but for someone who has to do it everyday I can understand why people hate it so much. 

One of the biggest downsides to reduced service to Brooklyn is to the many people who went to Atlantic Terminal as a shortcut to get to Lower Manhattan. When the LIRR reduced service to Brooklyn, these riders were basically forced to crowd onto Manhattan-bound trains, in which many of them will either go to Penn Station and the crowd the already crowded Seventh and Eighth Avenue Lines, or will go to Grand Central, and will be forced to walk all the way back to 48th St to reach the already severely crowded Lexington Avenue Line. Not a great choice, huh. Instead of being able to spread out across the 5 subway lines that serve Atlantic Terminal, have considerable capacity, and can get you anywhere in Lower Manhattan, there forced to overcrowd the packed subway trains in Manhattan.

Further, by scaling-down service to Brooklyn, the LIRR is actually hindering their operational flexibility. By sending pretty much all their traffic via the Main Line to Manhattan, they are basically placing all their eggs in one basket. If a service disruption or incident was to occur, they'd be forced to basically grind ALL service to a complete halt, without the flexibility to divert trains to/from Brooklyn, and it would be a complete mess in Jamaica with trains waiting for trackspace to discharge. If something were to happen at Forest Hills, for example, the entire Mainline would go down for good and that could ruin an entire rush hour causing a ripple effect and causing delays lasting for hours and hours on end. The LIRR shouldn't place all it's fate in the Main Line, as we've seen before, incidents are relatively common on the Main Line, and there've even been a couple of full suspensions. 

I'll be elaborating on this more in my reworked timetable project, but I believe the LIRR should operate a handful of locals to Brooklyn on the bigger branches, and provide more supplemental Brooklyn service during the peak and reverse-peak periods. By doing this, not only are they giving these branches more service, while giving Brooklyn riders more connection options, they are also allowing themselves some room in case of a delay on the Mainline. If there were to be a large enough delay to suspend the Main Line in either or both directions, they could divert trains to Brooklyn and people could then catch the subway up to Midtown or wherever else they want to go.

I believe it's important that the LIRR should evaluate demand on each one of the LIRR's branches, and determine which branches need Brooklyn service most, and at what times, and try to incorporate more of it as a supplement. If carefully planned, trains operating on the Atlantic Branch up to Brooklyn can stand clear of "more important" trains from the South Shore heading up towards the Main Line. They'd definitely have to make some changes to the track layout at Jamaica, but I'm sure it could be done relatively easily.

I'll be talking more about improvements to Brooklyn in my Reworked Timetable Project, as we go further into the smaller branches, so, you'll see just exactly what the LIRR could do to improve service there.

The LIRR's new service plan didn't unnoticed, as the baseline schedules did make some valuable improvements across the board including service patterns the LIRR should stick with, but it did reduce service where it's needed most, and it introduced some serious, structural flaws that shouldn't go unnoticed.  

And in conclusion, I believe the LIRR should go back to the drawing board, start from scratch, and rethink the service patterns, adding more trains to Brooklyn and HPA/LIC, instead of just diverting them there!