Friday, February 13, 2026

What The Port Washington Branch Timetable Could Look Like

Our first post will begin with a look at the Port Washington Branch. The Port Washington Branch is a unique branch because unlike virtually ever other branch it doesn’t pass through Jamaica, instead, merging into the Mainline at Woodside. The Port Washington Branch definitely isn’t the easiest as far as scheduling and service patterns go given it being a busy branch and the severe capacity constraints east of Great Neck, but it is easier in the sense that you don’t need to worry about coordinating transfers through Jamaica. However, it is imperative that you make an extra effort to evenly distribute trains between the two terminals and to try to allow for easy transfers whenever possible at Woodside. 

Included in the linked PDF file below is the fill sample weekday and weekend Port Washington Branch timetables. Peak, off-peak, reverse-peak and special-event trains have all been included. Note that this is a new and improved timetable design. 

The timetables only show revenue trains, not equipment or deadhead moves. I have planned out the deadhead moves, equipment rotations, etc as I was doing this project and I have most of these moves written down on paper and I have yet to insert them into the actual excel timetables. Nonetheless, I have tried whenever possible to minimize the amount of deadheading, since it’s essentially just wasted crew and equipment hours but in some cases it was unavoidable to make the most out of the resources available.

Key Assumptions:

  • One of the first things you'll notice about these fresh new timetables is the reintroduction of the Corona and Elmhurst stations onto the timetable. There's been talks for years about reopening the Elmhurst station which was closed many moons ago due to low ridership, which has came back to this area. It was even featured on the MTA's 2025-2044 20-year needs assessment to relieve crowding and congestion on the IRT Flushing Line. I feel that if they were to reopen Elmhurst, there's a decent chance they may also open the nearby Corona station to go along with it. I feel strongly that this would go along way in providing better access to transit for these Queens communities and help to relieve crowding on one of the subway's busiest lines.
  • While this could probably be worked-around should the need present itself, I feel very strongly that the LIRR should invest in going through the trouble of constructing a second track between Great Neck and Port Washington. While this would be extremely difficult given not only is there a viaduct, but that it's also a very fierce NIMBY area, with currently only one track, capacity is severely-limited east of Great Neck,  which is actually the busiest segment o the branch, and this would allow for service levels to be increased to match current demands and would improve reliability too. I designed these timetables in a way to reflect the second track, which sooner or later will have to be built
Service Guidelines:
  • At a minimum, service will be provided half-hourly to all stations along the branch during the off-peak periods (except overnight). During off-peak hours, trains will generally alternate between New York Penn and New York Grand Central, allowing for hourly direct rides to both termini.
  • During the weekday peak period, service, on average, consists of roughly 20 minute headways branchwide (there are a couple of exceptions). As a standard, the branch is split into two main halves: trains that operate East of Great Neck, and trains that begin their runs at Great Neck, turning via the Great Neck pocket track. To increase capacity, during the peak of the peak, additional trains have been ran from Little Neck, Bayside, and even one from Auburndale to increase capacity.
  • During the reverse-peak period, many equipment trains that operate against-the-flow to/from Great Neck to/from western terminals will accept passengers for all or part of their runs whenever possible to allow for robust reverse-peak service opportunties all the while reducing deadheading.
  • On weekends, service is increased during the busiest travel times (specifically 9am to 12pm WB, 4pm to 8pm EB) with half-hourly express service provided east of Great Neck, and half-hourly local service west of Great Neck.
  • Additional scheduled service to support events at Mets-Willets Point and Flushing Meadows has been included, however, this does not include unscheduled extra trains that run following the event as these cannot be planned, in normal cases, however, these trains will come fresh off the Great Neck Pocket track.

I specifically designed service on the Port Washington Branch to cater specifically to to those who live past the IRT Flushing Line's namesake terminal of Flushing-Main St, while still providing acceptable service levels in Queens to promote growth. Providing acceptable East of Great Neck wasn't by any means an easy task, considering the enormous capacity constraints, but I was able to work through it to the best of my ability. 

As of now, the best I could really guarantee for the most part is 20-minute headways in the peak direction, and whatever "scraps" were left went to reverse-peak, however, frequencies regularly exceed that especially in the portion west of Great Neck.

During off-peak periods, half-hourly service is provided with trains alternating terminal. While I believe that providing service along the branch every 20 minutes would be a good improvement that would promote growth, especially in the Queens communities, I don't feel like the Port Washington Branch is ridership-ready for that yet, and I think it won't be ready for a long while.

At stations like Great Neck,  I tried to create situations whenever possible . Take in the AM peak for example, in which train 413 (the 6:47am from Port Washington to Grand Central) stops at Great Neck at 6:57am, and a couple short minutes later, train #1315 (the 7:02am local from Great Neck to Penn) rolls in fresh from the Great Neck pocket track. So, technically, you could transfer between the two for service to the opposite terminal or for service to the latter zone. So, while connections aren't 100% guaranteed, it allows a traveller from Plandome, for example, to transfer trains at Great Neck to a local to Penn Station that follows behind the express, promoting quick and seamless intra-island travel without having to go all the way to Woodside. 

Like I emphasized above, the fact that the Port Washington branch doesn't pass through Jamaica makes traveling on the branch more difficult and cumbersome in that you don't have all the transfer options everyone else has at Jamaica, and by, coordinating these mini-transfers at Great Neck, it makes it difficult to provide I tried to keep most trains stopping at Woodside, besides a handful of key express trains along with a couple busy locals, as this is the closest thing this branch would have to Jamaica, and it allows for someone who may want to do the trek from the Port Washington Branch to somewhere else on the island to go via Jamaica and avoid the headache of going all the way to Manhattan.

Reverse-peak weekday service includes a number of newly added "revenue deadheads" that exist mainly to transport equipment for trains that turn at Great Neck, but now stop on the line with the sole purpose of providing supplemental service. During the evening peak, there's actually a nice assortment of reverse-peak trains up the branch out of Great Neck to the point where I subconsciously said evening peak!

I think I've now given you a good understanding of what service along the Port Washington Branch could look like in my new timetables. Feel free to comment if you have any questions about the scheduling or if you notice anything. I don't have the time to write a full in-depth analysis of every train and my reasoning behind it and time probably doesn't permit you to read it either, so, if anything is unclear and you'd like to know my reasoning behind it, just ask, I'd be more then happy to clarify. Additionally, I've made like millions of tiny little edits to the spreadsheet over the 18 months or so that I've been working on this project so it's very likely it’s very likely that some tiny or even major typos may arise, and if you catch any, please let me know of that, too. And finally, if you have any suggestions, and want to see something change, please let me know by leaving a comment at the bottom of these posts or leave me an email.

Monday, May 26, 2025

Could More Dual Modes Be A Suitable Substitute For Electrification?

In today's post, I'm going to build on yesterday's post about the Crippling State of the LIRR's Diesel Fleet, by talking more about the future of the LIRR's current diesel fleet.

In the LIRR's most recent 20-year needs assessment (which will soon be getting a post of it's own), the LIRR didn't mention anything about electrification out to Port Jefferson or Patchogue, hinting this is not coming in the next 10 or so years. They did say that they'd analyze it in the 2025-2029 capital program, suggesting it's coming.

While it wasn't mentioned in the 20-year needs assessment, the LIRR once again, for like the third capital program, did mention possible future electrification of the Main Line to Yaphank, along with capacity improvements on the Port Jefferson and Montauk branches. It seams, at least for now, that given the order of up to 66 new locomotives, they're going down the dual-mode route. Even if they weren't to electrify the Main Line to Yaphank, 66 new locomotives would be more than enough equipment to cover service on the Port Jefferson Branch, Montauk Branch, Oyster Bay Branch, and Main Line east of Ronkonkoma. They may also have enough equipment to use it as a supplement to MUs on busy trains on other electrified lines, such as an 8-car MLV set covering a busy westbound Babylon Branch train in the morning, for example.

I believe the LIRR made the right choice with replacement of it's diesel fleet. They bought enough of them to provide a comfortable level of service, where they don't have to worry about not having enough equipment, something they constantly have to deal with now, and they have a little "wiggle room" to expand. I mean, look, it's better to have extra diesels around, which could be used to supplement electric trains during events, or provide emergency service during after major catastrophes (think Long Beach after Hurricane Sandy), then to have too few when electrification projects fall through. 

I'd much rather have a couple of extras lying around, which I guarantee you they can somehow find a way to use, and even if they can't they can always lease them. Some have voice concerns about ordering too many, and then it would "come back to bite them" if they do manage to finish any electrification projects during that timeframe. To me, this is very shortsighted as given the MTA's current track record of getting things done, they typically set a release date and it typically goes over that, sometimes by even a third or half. If they are planning to electrify, then they'll have 25 years before these new locomotives are due for replacement, to finish the job. 

At this point, I think the LIRR should focus on improving service with the current fleet they've got and is getting. While electrification has and probably always will be the ideal option, as it allows for the lowest operating costs, direct service to all terminals, I believe if they truly make the best possible use out of the diesel equipment they have, then they could provide a level of service comparable to the average electric line.  Look at Metro-North, for example, which provides hourly dual-mode service to/from Poughkeepsie (besides the last train of the night from Croton-Harmon.) Those trains are constantly the most popular in the entire system, and are even more travelled than the electric trains are. If the LIRR were to adopt a similar system, they could possibly be even more successful.

I believe the main reason diesel service is so unattractive is because of the gaps. Frequencies are generally fine right now, and if they were to electrify to Patchogue and Port Jefferson, or provide dual-mode service, then they could probably provide hourly service to Port Jefferson and service every 30 minutes to Patchogue. While I believe hourly service is enough for my home section of the Montauk Branch west of Patchogue, if they were to electrify, they'd probably have to provide 30 minutes as a compensation for taking land. Plus they love to spoil this area anyway, so if there gonna electrify, you might as well let them do it. It would bring a lot to my area to have half-hourly service to points west.

Dual-Mode Fever

The massive order of 66 locomotives is more than enough to provide a baseline of hourly service from Patchogue, Oyster Bay, and Port Jefferson direct into Penn Station during pretty much all hours of the day, along with even better peak service than what is provided today. I'd say the biggest improvements would be on the East End, where they could close some of the largest gaps in service and provide more peak options. Look at Metro-North, which, like I mentioned above, provides a baseline of hourly-service to/from Poughkeepsie; that could represent service levels of Port Jefferson and Patchogue. Meanwhile, Danbury would do a great job representing Speonk and Oyster Bay (with roughly bi-hourly to/from HPA), Waterbury would represent the North Fork (with mainly shuttles to Ronkonkoma, possibly with the added bonus of a thru-train every once in a while), and Wassiac would represent service levels on the South Fork. Not only does Metro-North have considerable success with it's dual-mode operations, but, NJTransit's dual-modes are also doing a pretty good job.

If they are so popular, you may be wondering why the LIRR doesn't provide more dual-mode service now. I mean they have the equipment for it, and the demand, don't they? Well, the main reason they limit it is because they really don't have enough equipment to do so, and now that they'll have more equipment, this issue will finally be resolved.

I think the LIRR's main goal with buying these locomotives is mainly not only to expand their diesel fleet, but also to buy time to stall on electrification. Like I mentioned earlier, electrification should be the ultimate reward for these communities, as it provides a level of service that can't be seen using dual-modes, period, if the LIRR does a "free trial" using the dual-modes for 10-15 years, people of the communities in diesel territory will begin to realize the benefits, and possibly be more open to electrification.

In conclusion, yes, if the LIRR actually steps up and decides to make use of the new dual-mode locomotives to provide much-wanted dual-mode service, then, I strongly believe dual-mode service could supplement electrification, at least for a little while. 

Included below is a poll. Considering it's going to be another 20-25 years or so before these new coming locomotives are replaced, I'd love to know your opinion on how far you think the LIRR will have electrified it's system by the time 2045 rolls around:

Saturday, March 22, 2025

The LIRR’s Big Bet on Midtown

The LIRR’s service plan that was put into place on February 27, 2023 obviously placed much of its emphasis on Midtown Manhattan. The service plan essentially had all trains that had ran to either Atlantic Terminal or Hunterspoint Av to be reverted to Grand Central, and while the new terminal in the Lower East Side is huge for many, it was detrimental to those that relied on those alternate terminals- those which were growing rapidly. 

Under the new service plan, the railroad has essentially sent 90% of its capacity to either Penn Station or Grand Central, with only the small 10 percent of trains for riders looking for a one-seat ride to somewhere else. The worse part is, of those trains, most of them run during very inconvenient times- the only one seat rides on the Port Jefferson and Ronkonkoma Branches leave at 4:54am and 5:30am respectively. Trains on some of the smaller branches run during better times, and, it’s great to see one-seat rides to Brooklyn during the earlier part of the rush hour, however, the most room for growth is during the center of the rush hour, and I don’t think it could hurt if the LIRR added a train or two to Atlantic Terminal or Hunterspoint Avenue on the larger branches during the center of the rush hour. It would also be great to see the LIRR extend some of the shuttle sets during the reverse-peak periods further out to Long Island. I’m not fully aware, but I’m sure many people would you use a reverse-peak from Atlantic Terminal to/from let’s say Long Beach.  

By putting all the emphasis on the two Manhattan terminals, your actually limiting growth to the entire city, since, the most growth right now is to trips other then from Manhattan to Long Island. Hunterspoint Avenue continues to be treated as pretty much a complete afterthought, as it’s used only when the LIRR has absolutely no other choice in order to not clog up Jamaica. While some people actually didn’t expect Hunterspoint Avenue to survive into the new service plan, it did and the LIRR still hasn’t done anything to improve it. Service to Hunterspoint Avenue had been cut by 9%, and they didn’t even go as far as converting the empty equipment runs over to revenue trains, something that could be easily done for zero cost, and would be a huge step in improving service out there. 

Then, there’s of course, Brooklyn. Brooklyn is personal to me, as many of my first train trips had me taking the train there opposed to Penn Station to see family there. When East Side Access opened, virtually all thru-service to Brooklyn was cut and riders ended up with a clumsy, very sloppily scheduled, and aggravating shuttle service which required customers to go up and over to a completely separate shuttle platform. Initially, as crazy as this is, the railroad actually slashed peak service between Jamaica and Atlantic Terminal by 20% over pre-pandemic service levels, but soon completely reversed that decision soon afterwards after they were proven wrong. 

The origins of East Side Access

The Long Island Rail Road first began its journey down the East Side Access route in the mid to late 1990s when both the MTA and New York State set their sights on reviving proposals to build a brand new LIRR terminal in Manhattan’s East Side. Proposals to build a new rail link had been proposed since decades before, however, those efforts had been abandoned due to the city’s financial problems. In 1995, when it was originally proposed, the city was a completely different place. New York had still been recovering from people moving out to the suburbs, and crime was still a huge problem, and it was still coming off of the worst decade in New York history

By this time, the city finally began turning around and employment was growing substantially. Attention to housing, urban decay, and crime (something Detroit really needs!) really helped the city improve and expand. Business began to return to the city, and this brought in new commuters and fueled population growth. At that time, much of New York’s major commercial office activity was centered in Lower Manhattan, which was in tough shape after decades of decline and the stock market crash. While proposals were being floated for a huge megaproject, other projects were also being worked on (such as the Second Avenue Subway). Commercial activity in other parts of Manhattan (along with the outer boroughs) was limited, and while, Midtown (the area between 42nd and 59th Streets offered the most growth, little was done about it. When the MTA decided it wanted to spend billions of dollars on the Second Avenue Subway, obviously they had to give the Suburbs something in return, and the idea of building a rail link to one of the fastest growing commercial neighborhoods in the city seamed like a good idea.

Both the MTA and the LIRR doubled down on their efforts for Midtown Direct in the months following the 9/11 World Trade Center attacks. In the wake of all the catastrophic and tremendous damage done to the World Trade Center site, which was the largest concentration of jobs in the entire Financial District), many people thought that Lower Manhattan was done for good. When the MTA reconcentrated its efforts for East Side Access, everyone thought that the Lower East Side was the next big thing, and as we know that ended up being the case. Grand Central Madison was specifically designed to make it easy to get from the platforms to all the office buildings along Madison and Park Avenues.  

Hunterspoint Avenue and LIC

Since the completion of East Side Access, Hunterspoint Avenue and Long Island City have continued the infamous tradition of being a complete afterthought. Service to both of those stations continues to be atrocious, with large gaps even during peak hours. With the introduction of direct service to the East Side, many people who used to take the train there and catch a 7 train to Midtown now just go via Grand Central Madison, therefore, ridership decreased. However, there’s still a significant amount of potential ridership growth for people with origins and destinations in Queens itself, and I believe many more people would it use it if they gave it improved service.

And, the truth is as a Long Islander, I was just driving through the area right at the yards and the development in the area is very good, it’s definitely changed since before. Development in both Hunterspoint Avenue and Long Island City have both improved, and the skyline has actually changed considerably. 

Photo: Tri-State Rail NOW

According to the United States Census Bureau’s data, the total number of jobs in the Long Island City-Hunters Pt Neighborhood has increased by nearly 68% since 2010, and this area added over 15,000 new jobs over the last decade- while the LIRR still acts like nobody uses the station or could.

Approximately 40% of those who work in this area commute from the city itself, suggesting there’s significant potential for ridership to/from the greater LIC area. For years, the LIRR has ignored requests and proposals to improve service from these stations, especially from branches in electric territory. HPA and LIC have now become diesel-only stations, served by only the diesel branches which bring the most riders from Suffolk County (who account for less then 5% of commuter demand to this area!), and do not adequately serve people coming from places further into Queens and Nassau, which account for 35% of ridership demand to/from Hunterspoint Avenue and LIC. 

Additionally,  the population of the Long Island City - Hunters Pt area has actually tripled over the last 10 years, adding 20,000 more residents who could probably take a job on Long Island if they had reasonable reverse-peak service there.

Requiring riders to either one take the subway to either Grand Central (requiring you to double back) or Woodside is definitely not an acceptable alternative. Not only are you charged for the railroad, but you also must pay a subway fare in addition to having to spend 12 additional minutes on your trip. 

I strongly suggest the LIRR should considering service to both Hunterspoint Avenue and Ling Island City, by at the minimum providing faster, and more frequent service then what is currently provided. The good thing is, the LIRR can actually do this pretty easily, and there are several ways to accomplish this, in which many of these can largely be accomplished without utilizing existing train and crew downtime outside of rush hours:

  • Converting all equipment trains and hard trains that currently run empty between LIC and Jamaica during reverse-peak and midday periods, including several revenue trains that run empty to Jamaica before starting revenue service there. 
  • Extending all diesel trains (at least on the Oyster Bay Branch) to operate to/from Hunterspoint Av and LIC. In addition to providing service to HPA/LIC while not sacrificing Manhattan service, this would also benefit diesel branch riders as they wouldn’t have to deal with annoying transfers at Huntington and double-transfers at Babylon (while I’d say the Huntington up-and-over is much worse then Babylon). 
  • Adding additional trains from the smaller electric branches to and from HPA and LIC. The LIRR’s current service plan currently has the small electric branches (West Hempstead, Hempstead, Long Beach, and Far Rockaway) continuing to see frequencies way below their capacity. The LIRR’s could easily add trains from those branches there to accomplish several things: better serve the Nassau-Queens commuter market, provide additional service opportunities to everyone on the smaller branches (no matter their destination)c, and allowing the LIRR to load these grains with the more local stops in lieu of adding stops on busier Manhattan-bound trains from busier branches, reducing travel-time for those riders all the while providing more service to HPA/LIC.
  • Reducing travel-time between Hunterspoint Avenue and Long Island City. It’s rare that you can “reduce travel time” on the LIRR, however, currently, all trains from LIC must park at Hunterspoint Avenue for several minutes, while they “load up” passengers. There’s absolutely no need for that, and given the very small distance between the stations, many trains can make the distance in only 5-7 minutes. 
  • Adding additional shuttles between Jamaica and HPA/LIC. While I can understand why the LIRR is hesitant about sending electric trains there, especially considering not all the tracks at LIC are electrified, these could help address the most acute gaps in service and can work very similar to the Brooklyn shuttles. These sets can be fed from Hillside or Jamaica-Johnson Avenue during rush hours, and can run back and forth before heading back to the yard following rush hours. 

Overall, the LIRR still serves Long Island City as if it’s only home to half-abandoned warehouses and is all industrial, yet it’s instead a thriving and rapidly growing neighborhood. There are many opportunities for the LIRR to grow service at both HPA and LIC in a way that can’t be done via a subway transfer. Even if they only convert a couple of equipment trains, it’s still something. 

Brooklyn 

Brooklyn is perhaps the worst of the problems of the new service plan. The LIRR's elimination of through-service from Brooklyn to eastern points on Long Island meant a big blow to these commuters, especially considering 85% to 90% of those riders needed to get somewhere further east then Jamaica, where the shuttles end.

The thing is ridership is growing to Brooklyn at a much faster rate then what is seen to Manhattan, and according to ticket sales data, ridership grew a whopping 23% to Brooklyn between 2016 and 2019, thats nearly half of all the new riders wanting to go to Brooklyn.

In my opinion, if anything, the LIRR should be looking to increase service to Brooklyn, not reduce it! It's even worth nothing that the considerable growth Brooklyn has gotten has taken place even after the LIRR has pretty much ignored it over the last 40 years. You can only imagine the growth that would occur if the LIRR actually improved service substantially there.

Brooklyn is more personal to me because I used to take it before the service changes much more to go see family, but as time has gone on, I've unfortunately gone there less, however, when I do take the train there, the up-and-over normally doesn't bother me to much, but for someone who has to do it everyday I can understand why people hate it so much. 

One of the biggest downsides to reduced service to Brooklyn is to the many people who went to Atlantic Terminal as a shortcut to get to Lower Manhattan. When the LIRR reduced service to Brooklyn, these riders were basically forced to crowd onto Manhattan-bound trains, in which many of them will either go to Penn Station and the crowd the already crowded Seventh and Eighth Avenue Lines, or will go to Grand Central, and will be forced to walk all the way back to 48th St to reach the already severely crowded Lexington Avenue Line. Not a great choice, huh. Instead of being able to spread out across the 5 subway lines that serve Atlantic Terminal, have considerable capacity, and can get you anywhere in Lower Manhattan, there forced to overcrowd the packed subway trains in Manhattan.

Further, by scaling-down service to Brooklyn, the LIRR is actually hindering their operational flexibility. By sending pretty much all their traffic via the Main Line to Manhattan, they are basically placing all their eggs in one basket. If a service disruption or incident was to occur, they'd be forced to basically grind ALL service to a complete halt, without the flexibility to divert trains to/from Brooklyn, and it would be a complete mess in Jamaica with trains waiting for trackspace to discharge. If something were to happen at Forest Hills, for example, the entire Mainline would go down for good and that could ruin an entire rush hour causing a ripple effect and causing delays lasting for hours and hours on end. The LIRR shouldn't place all it's fate in the Main Line, as we've seen before, incidents are relatively common on the Main Line, and there've even been a couple of full suspensions. 

I'll be elaborating on this more in my reworked timetable project, but I believe the LIRR should operate a handful of locals to Brooklyn on the bigger branches, and provide more supplemental Brooklyn service during the peak and reverse-peak periods. By doing this, not only are they giving these branches more service, while giving Brooklyn riders more connection options, they are also allowing themselves some room in case of a delay on the Mainline. If there were to be a large enough delay to suspend the Main Line in either or both directions, they could divert trains to Brooklyn and people could then catch the subway up to Midtown or wherever else they want to go.

I believe it's important that the LIRR should evaluate demand on each one of the LIRR's branches, and determine which branches need Brooklyn service most, and at what times, and try to incorporate more of it as a supplement. If carefully planned, trains operating on the Atlantic Branch up to Brooklyn can stand clear of "more important" trains from the South Shore heading up towards the Main Line. They'd definitely have to make some changes to the track layout at Jamaica, but I'm sure it could be done relatively easily.

I'll be talking more about improvements to Brooklyn in my Reworked Timetable Project, as we go further into the smaller branches, so, you'll see just exactly what the LIRR could do to improve service there.

The LIRR's new service plan didn't unnoticed, as the baseline schedules did make some valuable improvements across the board including service patterns the LIRR should stick with, but it did reduce service where it's needed most, and it introduced some serious, structural flaws that shouldn't go unnoticed.  

And in conclusion, I believe the LIRR should go back to the drawing board, start from scratch, and rethink the service patterns, adding more trains to Brooklyn and HPA/LIC, instead of just diverting them there!

Friday, March 07, 2025

What The Port Washington Branch Timetable Could Look Like

Today I’ll unveil the first of the 14 timetables that is part of the LIRR Reworked Timetables project. Our first post will begin with The Port Washington Branch. The Port Washington is known by the railroad and railfans for being the only branch that doesn’t pass through Jamaica, instead it merges into the Main Line at Woodside. The Port Washington Branch is definitely not the easiest as far as scheduling nor service patterns, but it’s a lot easier in the sense that you don’t have to worry about Jamaica. Since I’m aware of this, when making these timetables, I did my very best to evenly distribute the trains between New York Penn and Grand Central, and I will try to have easy transfers available to the other terminal at Woodside.

Included in the linked PDF file below is the Full Sample Weekday and Weekend Port Washington Branch Timetable. Peak, off-peak, extra, and special event trains have all been included. Note that this is a new and improved timetable design.

The timetables have yet to include the deadhead/non-revenue moves which will be planned out along with the crew and equipment rotations using AI and will be written down on paper. They’ll be included in a separate page in the attached pdf. Nonetheless, I have tried whenever possible to minimize the amount of deadheading as it’s essentially wasted crew and equipment hours. However, in some cases, it’s unavoidable in order to make the best use out of the resources available.

Like what was said on the introduction page yesterday, “Key Assumptions” needs to be taken care of and mentioned before this project can become totally feasible. I’ve tried my best to design the schedules and trains in a way that makes these schedules able to be used whether or not these projects are completed but in same cases that’s not possible.

Key Assumptions:

  • I’ve added in Corona & Elmhurst stations to the excel timetables, because I think the LIRR will bring them back into service, as Elmhurst Station was featured in the MTA’s 2025-2044 20-Year Needs Assessment to relieve crowding and congestion on the IRT Flushing Line. I also feel that if Elmhurst Station was revived, Corona could go along with it. This also makes the schedules more adaptable, however, it is very important to note that there is absolutely no time difference for WB and EB trains alike to stop there due to the fact that these stations are very small.
  • While this can probably be worked around, a second track between Manhasset and Port Washington would really help build capacity up on this portion of the line.
Service Guidelines:
  • At a minimum, service will be provided half-hourly to all stations along the branch (with the only exception being late-nights). During the off-peak periods, trains will alternate between New York Penn and New York Grand Central Terminal for the most part, allowing for hourly direct rides to both terminals.
  • During the weekday peak period, service consists of 20-minute headways branchwide (there are a couple of exceptions). The branch is split between two main halves: trains that operate east of Great Neck and trains that begin their runs at Great Neck, turning via the Great Neck Pocket Track. To increase service during the peak of the peak, additional trains have been run from Little Neck, Bayside, and Douglaston.
  • During the reverse-peak period, some equipment trains that operate against-the-flow from Great Neck to/from western terminals will now accept revenue passengers for all or part of their runs alternating terminals when possible to allow for robust reverse-peak service, while minimizing deadheading.
  • On weekends, train service is increased during the busiest times: (specifically 8:30 AM WB to 11:30am WB and 4:00 PM EB to 7:30 PM EB.) During these times, train service operates with 15-minute headways branchwide and operates on a similar model to the 6 train, with the outer-zone receiving express service while local trains start out of Great Neck.
  • Additional scheduled service to support events at Mets-Willets Point/Flushing Meadows Park have been included, however, this does not include unscheduled extras that typically run following the completion of an event as those cannot be planned, but in normal cases, those trains will either turn off EB trains at Great Neck or will come fresh from the Great Neck Pocket Track.


I designed service on the Port Washington Branch to cater to those who live past the IRT Flushing Line’s namesake terminal of Flushing-Main St, while still providing acceptable service that promotes growth to those who live in Queens. 

As of now, the best I could guarantee was 20-minute headways sustained in the peak direction, however, frequencies regularly exceed that, especially on the busier portions of the branch. 

During off-peak periods, half-hourly service is provided with trains alternating terminals. 

At stations like Great Neck, I tried whenever possible in situations where two trains depart within minutes of each other to operate to different terminals. Take the AM peak period, for example, in which train 413 (the 6:47am train from Port Washington to Grand Central) stops at Great Neck at 6:57am. A couple of minutes later, train 1315 (the 7:02am local from Great Neck to Penn Station) rolls in. So, while connections aren’t guaranteed, it allows a traveller from Plandome, for example, to transfer trains at Great Neck to the local to Penn Station that follows behind the express, promoting quick intra-island travel and allowing for quick transfers. 

Like I emphasized above, the fact that the Port Washington Branch doesn’t stop at Jamaica makes traveling on the branch much more difficult, and by coordinating little “mini-transfers” at Great Neck, that makes things much easier. I tried to keep most trains stopping at Woodside, besides some of the major express trains as it allows for people to easily get to the terminal of their choice, and it also allows for someone who might want to travel to somewhere else on the island to avoid the headache of having to go all the way into Manhattan.

Reverse-peak weekday service includes a number of “revenue deadheads” that exist mainly to transport equipment for trains that turn at Great Neck, but now stop on the line just to provide supplemental service. Some of the deadheads that don’t run as revenue trains, however, have actually been kept in the schedule as Mets Extras that run when the Mets play evening games at home.  During the evening reverse-peak, there’s a notable amount of trains that begin out of Great Neck, to the point where I by accident said evening rush! I was also able to sneak an additional train out of Bayside, too.

I think I’ve now given you a good understanding of how Port Washington Branch service could look like on these new timetables. Feel free to comment if you have any questions about the scheduling or if you notice something. Time does not permit me to write an in-depth analysis of every train and probably doesn’t permit you to read it, either, so if anything is unclear or you’d like to know my reasoning behind something, please just ask. Additionally, I’ve made millions of tiny edits to the excel spreadsheet over the 11 or so months I’ve been working on this branch’s timetables so it’s likely that some tiny (or major) typos will arise, and if you catch any, please let me know of that, too. And finally, if you have any suggestions, and want to see something changed, please let me know by leaving a comment at the bottom of these posts or you leave me an email me at gavin.s.wilcox@gmail.com.

View an index of all the other sample timetables, the post about those timetables, and revision history, right here.

Sunday, March 02, 2025

What The LIRR's Future Timetables Could Look Like

It’s March 2nd, 2025, a little over two years after Long Island Rail Road’s East Side Access (ESA) project opened on January 25th, 2023, and since the opening of Grand Central Madison and the Long Island Railroad’s biggest timetable refinements in history, very little has changed to improve upon the original June 2022 draft timetables, and most of the changes they have made have only been minor tweaks to times, and cuts in service. On February 27th, 2023 when full direct service to Grand Central Madison began, not only was that monumental for the railroad for getting a new station, but also it was also the first and one of the only points in history when they’ve completely redone their timetables from scratch.

With all that being emphasized, in their draft schedules, the LIRR did restart their schedules from scratch and ripped up a lot of service patterns along with creating new ones. And, the new East Side Access timetables did bring a lot of improvements to the table such as hourly West Hempstead service to Atlantic Terminal, sending off-peak Far Rockaway & Hempstead Branch trains to Manhattan opposed to Brooklyn, enhanced reverse-peak service on all branches, etc. However, the new timetables weren’t all good and have been plaguing riders (especially riders on Diesel Branches, Brooklyn, Hunterspoint Avenue & Long Island City) with many problems such as uneven gaps, very little (almost fully decimated) through service to Brooklyn, and the removal of timed-transfers (which is arguable). Not only that, but, the railroad gave no improvement to diesel territory service (with no additional dual-mode service along with very little increase in trains, almost all just time refinements), very little additional peak service to Long Island overall, and the Port Washington Branch is probably the worst of the problems with terrible distribution of trains to both city terminals and because the line doesn’t pass through Jamaica which makes things that more difficult, they’ve done little to provide connections to the other terminal at Woodside.

Now, it’s come to my plan. I've been working on a project over the last 10 months or so to revamp the LIRR's Post-ESA Timetables, and I will try my best to fix all the problems that the current schedules bare as well as commuter complaints.

First of all, I will completely start fresh and throw out the old timetables, in place of new timetables in a fresh excel workbook, (with a new & improved timetable design that greatly improves upon the LIRR’s standard design based mainly off Metro-North’s design) and in doing this I will start fresh with a set of new service patterns, along with some of the older ones from the current and prior schedules. Tomorrow I will begin with the easiest branch, The Port Washington Branch, and work my way up to the crazy Babylon Branch and Mainline.

As far as the page layout goes, each page will begin with some information on the branch, and how I plan to make the timetable service layout. The next section will be called “Key Assumptions” which will layout some basic things (such as infrastructure) that need to be in place (I tried to minimize this as much as possible) in order for these new timetables to function correctly, along with “Service Guidelines” which will list some basic information & principals for how peak & off-peak service will work.

I will try my absolute best to make these timetables as efficient as possible for everyone, but, I guarantee you it will be a challenge to make everything fit together especially at Jamaica, on the mainline, and areas W. of Jamaica, along with during the peak-of-the-peak. Before I start, I’d like to make clear to you that even if the LIRR was to take parts of this schedule and substitute/implement them it would improve service along the line in that area dramatically.

Just to make this clear, (if it’s not already), none of these timetables or this document is official LIRR (or MTA) material. I am hoping the railroad will at least look at and maybe adopt some of the service changes, if not completely implementing these schedules depending on the outcome of them. I will try my best to represent the best use of LIRR infrastructure currently, and whether or not they agree with what I think is not known, (but with the state of the railroad right now, I don’t like my chances).

While making these timetable document pages, I will try my best to explain my reasoning for things, as well as the service patterns, but time simply doesn’t permit me to explain every little tweak and oddity that occurs in the schedules. I will also try my best to not make tiny (or even major) typos while making these timetables, but due to the shear amount of edits that will need to be made to the excel spreadsheet, it’s very likely some will come up. And I’ve also tried to find and think of everything, but I’m not aware of the needs of everyone, and I cannot find every grammar mistake that comes up. but if you spot a mistake or have any questions/comments/concerns please feel free to e-mail me at gavin.s.wilcox@gmail.com.

I have set up this page on the site as the "table of contents" or "database" for the project and will list links to each of the branches (in order to when made) timetables. Also, when I publish each branch's timetable and publish it, I do not intend for that to be the end of that timetable, as I work on other branches I will most likely have to make dozens of revisions to make trains fit together. At one point, after everything is completed, I will throw together one final book that will feature all of the timetables and service explanations, however, that will be a long time from now as a million different revisons will occur before then (it's just obvious!!!). But, anyways, let us start with the Port Washington Branch!